PIT-INSP-05-Pipeline
Installation / equipment identification data: Pipes
Type of inspection:
Technical inspection in use
Technical inspection in use after repair
Technical inspection to authorize operation
Inspection / test / verification methods according to:
3.1. Inspection procedure: PIT-INSP-05
3.2. Technical prescription: PT C 10/2010
Inspection / verification / testing facilities and equipment specific to each type of installation / equipment provided by the owner / maintainer (weights whose mass can be determined with metrologically verified measuring instruments)
Inspector security requirements: PG-INSP-16, specific OSH and SU requirements
Inspection activities:
I. Preliminary checks
6.1. Technical installation documentation, registers, etc.
II. Technical checks
6.2. External verification
6.3. Checking safety devices / safety valves
6.4. Hydraulic pressure test / Pneumatic pressure test
6.5. Tightness test
Preparation of the Inspection Report