PIT-INSP-01-Boiler

1.  Name of installation / equipment: Boilers
2. Inspection type:
Technical inspection in use
Technical inspection in use after repair
Technical inspection to authorize operation
3. Inspection / test / verification methods according to:
3.1  Inspection procedure: PIT-INSP-01
3.2  Technical prescription: PT C1 / 2010, PT C11 / 2010, PT C7 / 2010.
4. Inspection / verification / testing facilities and equipment specific to each type of installation / equipment provided by the owner / maintainer (metrologically verified measuring and monitoring equipment)
5.  Inspector security requirements: PG-INSP-16, specific OSH and SU requirements
6. Inspection activities:
I.  Preliminary checks
6.1.  Technical documentation, mandatory installation permit, registers, etc.
II. Technical checks
6.2. Internal overhaul – internal inspection
6.3. Internal inspection – external inspection
6.4. Checking safety devices / safety valves
6.5. Hydraulic pressure test
6.6. Hot test
6.7. Technical verification of chemical regime
7.  Preparation of the Inspection Report.