PIT-INSP-03- Containers

1. Installation / equipment identification data: Containers
2. Type of inspection:
Technical inspection in use
Technical inspection in use after repair
Technical inspection to authorize operation
3. Inspection / test / verification methods according to:
3.1 PIT-INSP-03 inspection procedure
3.2 Technical prescription: PT C 4-2010, PT C 12-2003
4. Inspection / verification / testing facilities and equipment specific to each type of installation / equipment provided by the owner / maintainer (metrologically verified measuring and monitoring equipment)
5. Inspector PG-INSP-16 security requirements, specific OSH and SU requirements
6. Inspection activities:
I. Preliminary checks
6.1. Technical documentation, registers, etc.
II. Technical checks
6.2. Internal overhaul – internal inspection
6.3. Internal inspection – external inspection
6.4. Checking safety devices / safety valves
6.5. Hydraulic pressure test
6.6. Pneumatic tightness test
6.7 Checking the degree of vacuum
7. Preparation of the Inspection Report