PIT-INSP-03 Containers

  1. Installation/equipment identification data: Containers
  2. Inspection Type:

Technical inspection in use

Technical inspection in use after repair

Technical inspection to authorize operation

  1. Inspection/test/verification methods according to:

3.1 PIT-INSP-03 inspection procedure

3.2 Technical prescription: PT C 4-2010, PT C 12-2003

  1. Inspection/verification/testing facilities and equipment specific to each type of installation/equipment provided by the holder/maintainer (metrologically verified measurement and monitoring equipment)
  2. Inspector PG-INSP-16 safety requirements, SSM and SU specific requirements
  3. Inspection activities:
  4. Preliminary checks

6.1. Technical documentation, registers, etc.

  1. Technical checks

6.2. Internal inspection – internal check

6.3. Internal inspection – external check

6.4. Checking safety devices/safety valves

6.5. Hydraulic pressure test

6.6. Pneumatic sealing test

6.7 Check the vacuum degree

  1. Preparation of the inspection report