PIT-INSP-02 Boilers

  1. Installation/equipment identification data: Boiler
  2.  Inspection Type:

Technical inspection in use

Technical inspection in use after repair

Technical inspection to authorize operation

  1. Inspection/testing/verification methods:

3.1 Inspection procedure: PIT-INSP-02

3.2 Technical prescription: PT C9/2010, PT C11/2010, PT C7/2010

  1. Inspection/verification/testing facilities and equipment specific to each type of installation/equipment provided by the holder/maintainer (metrologically verified measurement and monitoring equipment)
  2. Inspector safety requirements: PG-INSP-16, SSM and SU specific requirements
  3. Inspection activities:
  1. Preliminary checks

6.1. Technical documentation, mandatory installation notice, registers, etc.

  1. Technical checks

6.2. Internal inspection – internal check

6.3. Internal inspection – external check

6.4. Checking safety devices/safety valves

6.5. Hydraulic pressure test

6.6. Hot test

7. Preparation of the inspection report.