PIT-INSP-02-Boiler

1.  Name of installation / equipment: Boiler
2. Inspection type:
Technical inspection in use
Technical inspection in use after repair
Technical inspection to authorize operation
3. Inspection / test / verification methods:
3.1 Inspection procedure: PIT-INSP-02
3.2 Technical prescription: PT C9 / 2010, PT C11 / 2010, PT C7 / 2010
4. Inspection / verification / testing facilities and equipment specific to each type of installation / equipment provided by the owner / maintainer (metrologically verified measuring and monitoring equipment)
5. Inspector security requirements: PG-INSP-16, specific OSH and SU requirements
6. Inspection activities:
I. Preliminary checks
6.1. Technical documentation, mandatory installation permit, registers, etc.
II. Technical checks
6.2. Internal overhaul – internal inspection
6.3. Internal inspection – external inspection
6.4. Checking safety devices / safety valves
6.5. Hydraulic pressure test
6.6. Hot test
7. Preparation of the Inspection Report